Permits in Hillsborough County
Building, zoning, environmental, and right-of-way permitting across Hillsborough County. Jurisdiction matters, the same project can need a different permit path in different cities.
Find a Florida DEP environmental application
Search official Florida DEP environmental resource or coastal applications by exact application number or published site address. Other local and water-management district permits may not appear here.
For permit documents, full records, current decisions and agency jurisdiction, check the official DEP permit search instructions.
Building & Construction
Commercial and Multifamily Building Permit Routing — Hillsborough County
Route commercial, mixed-use, and multifamily construction to the building authority for the parcel. Unincorporated Hillsborough uses County Development Services/HillsGovHub; Tampa uses City Construction Services/Tampa Accela; Plant City uses its Building Division/MaintStar; Temple Terrace uses City Building & Permitting. Site, zoning, fire, utilities, floodplain, natural-resources, accessibility, right-of-way, and outside-agency reviews are project- and jurisdiction-dependent rather than a single County-wide checklist.
Fence and Wall Approval Routing — Hillsborough County
Route a proposed fence, wall, screen, or gate to the parcel's zoning and building authority. Zoning placement review and building-permit review are separate determinations, and the responsible jurisdiction must confirm the current rules for the actual location, height, material, design, and related work.
Residential Building Permit Routing — Hillsborough County
Route residential construction to the building authority for the parcel before preparing an application. This workflow covers a new house, single-family home, home construction, deck, covered porch, room addition, accessory structure, roofing, pool, or trade work. Hillsborough County, Tampa, Plant City, and Temple Terrace operate separate permit processes and portals. This is an intake and routing workflow; the responsible authority's current permit-type instructions govern submittal documents, review, fees, and inspections.
Roofing Permit Routing — Hillsborough County
Route roof replacement, reroofing, roof repair, recover, and roof-related structural or trade work to the building authority for the parcel. The four Hillsborough jurisdictions use separate intake systems and may classify scope differently; this workflow does not assert a universal permit exemption, document list, fee, or review time.
Swimming Pool and Spa Permit Routing — Hillsborough County
Route new and altered pools, spas, and related decks/equipment through the building authority for the parcel. Private residential and public swimming pools have different approval paths; public pools also require the applicable Florida Department of Health review. Zoning, barrier, electrical, plumbing, mechanical, structural, drainage, environmental, and safety requirements depend on the project.
Environmental & Coastal
Dock, Seawall, Dredge/Fill and Water-Dependent Approval Routing — Hillsborough County
Route docks, boat lifts, seawalls, shoreline stabilization, dredging, filling, and other water-dependent work through every applicable local, EPC, state, submerged-lands, and federal review. Project location, ownership, wetlands and surface-water impacts, navigation, scope, and authorization type determine which approvals apply; no one approval is represented as satisfying the others.
Onsite Sewage / Septic System Permit
Florida DEP's Onsite Sewage Program governs onsite sewage treatment and disposal systems (OSTDS), commonly called septic systems. The permit path is separate from County or city building and land-development approval. Confirm the current Hillsborough processing office and application route through DEP's official onsite-sewage resources before construction, repair, modification, or abandonment.
Tree Removal, Pruning and Protection Routing — Hillsborough County
Route tree removal, pruning, relocation, protection, and development impacts to the authority for the parcel and tree location. Protected status, permit need, mitigation, emergency handling, right-of-way or utility control, and natural-resource review are project- and jurisdiction-specific; this workflow does not publish one countywide tree rule.
Water Well Construction, Repair, Modification, or Abandonment
The Southwest Florida Water Management District states that a Well Construction Permit is required before installing a water well in the District. Its well-construction page also publishes the state application for construction, repair, modification, or abandonment and licensed-contractor resources. Local land-development, utility, environmental, and building approvals remain separate.