Fence and Wall Approval Routing — Hillsborough County
Route a proposed fence, wall, screen, or gate to the parcel's zoning and building authority. Zoning placement review and building-permit review are separate determinations, and the responsible jurisdiction must confirm the current rules for the actual location, height, material, design, and related work.
Flagged source reviewed 2026-10-17. How we check sources
Check what applies to your address
Get a free answer for your location and project, rather than relying only on this general guide.
Need everything organized? For eligible projects, the optional $19 Project Kit brings your filing steps, official documents, fees and progress checklist together. Government fees are separate.
Who needs this
Owners, tenants with authorization, contractors, and design professionals proposing a new or altered fence, wall, screen, or gate in unincorporated Hillsborough County, Tampa, Plant City, or Temple Terrace.
Steps
- 1
Confirm the parcel jurisdiction
Determine whether the site is in unincorporated Hillsborough, Tampa, Plant City, or Temple Terrace before applying. A mailing city, postal address, or utility provider does not establish zoning or permitting authority.
maps.hillsboroughcounty.org/MapHillsborough/MapHillsborough. - 2
Document the site and proposed work
Identify property lines, easements, rights-of-way, corner or driveway visibility areas, water or drainage features, existing structures, fence or wall location, height, material, gates, retaining function, and any pool, historic, commercial, multifamily, or security context.
hcfl.gov/businesses/zoning - 3
Obtain the responsible zoning determination
Ask the jurisdiction's planning or zoning office to confirm allowed placement, height, setbacks, visibility, materials, and any district, overlay, historic, or use-specific conditions. This workflow does not substitute one jurisdiction's dimensional rules for another's.
tampa.gov/department/development-coordination - 4
Confirm building-permit requirements separately
After zoning review, ask the same jurisdiction's building authority whether the actual fence, wall, gate, foundations, structural or electrical work requires a building or trade permit and which current application type applies. No universal exemption is asserted.
plantcitygov.com/departments/development/building/index.php - 5
Resolve conditional approvals and private restrictions
Confirm right-of-way, utility/easement, drainage, floodplain, natural-resource/tree, pool-barrier, fire-access, historic, transportation, and other reviews when applicable. Homeowners-association or deed restrictions are private and do not replace government approval.
templeterrace.gov/127/Planning-Zoning - 6
Submit the jurisdiction-specific materials and fees
Use HillsGovHub for unincorporated County work, Tampa's current development/construction channel, Plant City's current planning/building channel, or Temple Terrace planning/building instructions. Submit the site plan or survey, owner authorization, design details, contractor credentials, and other material the authority requests; fees are calculated from the live case.
hcfl.gov/businesses/hillsgovhub - 7
Wait for issuance and complete inspections
Do not begin regulated work until required zoning approval, permits, and companion approvals are issued. Schedule assigned inspections and confirm final status with the issuing authority.
templeterrace.gov/123/Building-and-Permitting
Requirements
- Use the zoning and building authorities for the parcel jurisdiction.
- Obtain a parcel-specific zoning determination before relying on placement or dimensional assumptions.
- Confirm building and trade permit requirements from the actual design and scope.
- Resolve conditional right-of-way, easement, drainage, pool-barrier, historic, floodplain, tree, and other reviews.
- Complete required inspections and closeout.
Documents
- Property address, parcel identity, and owner authorization
- Current survey or site plan showing property lines, easements, rights-of-way, structures, proposed location, and dimensions as required
- Fence, wall, gate, footing, structural, electrical, and material details as applicable
- Contractor credentials and related approval records when required
- Inspection and closeout records when assigned
Fees
| Item | Amount | Notes |
|---|---|---|
| Unincorporated Hillsborough fence or wall review | Use current County fee schedules, calculators, and maps for building-permit and zoning-application fees; no universal amount is stated. | |
| Tampa fence or wall review | Use the current City planning/construction record and fee materials for the actual scope. | |
| Plant City fence or wall review | Use current City planning/building application and fee materials for the actual scope. | |
| Temple Terrace fence or wall review | Use current City planning/building application and fee materials for the actual scope. |
Good to know
Zoning approval and building-permit review are separate determinations.No universal permit exemption, height, setback, placement rule, fee, or timeline is inferred across the four jurisdictions.A private HOA or deed restriction does not replace government approval, and government approval does not waive a private restriction.Temple Terrace online permitting notice (checked October 17, 2026): the City's Applications and Forms page says online permitting services will be temporarily unavailable beginning Monday, October 26. Check the City's current availability and filing instructions before submitting online.