Skip to main content

Government services, mapped in Palm Beach County

A clear path through Palm Beach County, its municipalities, and applicable Florida and federal agencies.

Building & Construction

Building permit authority routing

Resolve exact parcel jurisdiction first. PBC Permit Center processes building construction permits in unincorporated County. Each incorporated municipality needs its own verified permit authority and destination; use the published local department or portal path.

atlantisbelle-gladeboca-raton

Fence, shed and accessory improvements

Determine the local jurisdiction, parcel zoning, easements and proposed dimensions first. Ask the local Building Division which permit type or exemption applies to the specific fence or accessory structure, including flood and utility constraints. County supplemental standards and district rules are relevant only to unincorporated property. There is no countywide size or fence height shortcut for all municipalities. Do not place improvements in easements or rights of way based on a generic website answer.

atlantisbelle-gladeboca-ratonFees listed

Home addition and structural renovation

Confirm whether the parcel is municipal or unincorporated, then verify zoning setbacks, lot coverage, height and existing approvals with the responsible zoning office before paying for final plans. County additions use the current building permit checklist, site survey, scope and construction plans required for the selected type. Check flood review, easements, septic capacity, utility and impact fee issues for the proposed increase. File the local permit, obtain plan approvals and complete required inspections. An appraisal record or postal address cannot establish buildable area.

atlantisbelle-gladeboca-ratonFees listed

Residential pool and safety barrier

A proposed pool needs local zoning and building review for the exact site, including location, setbacks, easements and pool equipment. The County publishes Residential Swimming Pool Safety Requirements as a specific supplemental form. Use it with the selected County permit checklist and plans for unincorporated property. Confirm approved safety barriers and inspections with the building official rather than assuming an existing fence qualifies. Municipal applications and public pool health licensing are separate.

atlantisbelle-gladeboca-ratonFees listed

Roof replacement and reroof forms

For an unincorporated reroof, use the permit checklist and Building Division application with the form matching the roof system: 100 shingles or shakes, 200 concrete or clay tile, 300 metal, or 400 flat roof. Include the product approvals and supporting details required by the selected checklist. Confirm contractor qualifications, roof scope, design and inspections before filing. A city reroof uses that city’s forms and fee schedule. Do not invent a flat fee or assume a minor repair exemption. For unincorporated single-family, duplex and attached residential reroofs the County also has a conditional ePZB self-issued reroof process for permit class 4081. The portal itself decides eligibility from the project questionnaire; an application starting PR is routed for plan review and is NOT an issued permit, whereas B indicates issuance. Even for a B-number, government fees must be paid before any work; unpaid permits expire in 10 days. This path is NOT available automatically to municipalities, and the project-specific County charge and any additional conditions must be verified in the government portal.

atlantisbelle-gladeboca-ratonFees listed

Rooftop solar PV filing

County forms include the Expedited Solar PV Permit Application and PV Rooftop Installation form. Ask the unincorporated Building Division whether the proposed system qualifies for the expedited path; use the selected checklist, equipment details, electrical and mounting plans and product approvals required for the project. Structural suitability, local zoning and inspections are separate from utility interconnection. A municipal site uses its city permit path. Contact the electric utility for its interconnection approval before energizing.

atlantisbelle-gladeboca-ratonFees listed