Rooftop solar PV filing in Palm Beach County

atlantisbelle-gladeboca-ratonboynton-beachbriny-breezescloud-lakedelray-beachglen-ridgegolfgreenacresgulf-streamhaverhillhighland-beachhypoluxojuno-beachjupiterjupiter-inlet-colonylake-clarke-shoreslake-parklake-worth-beachlantanaloxahatchee-grovesmanalapanmangonia-parknorth-palm-beachocean-ridgepahokeepalm-beachpalm-beach-gardenspalm-beach-shorespalm-springsriviera-beachroyal-palm-beachsouth-baysouth-palm-beachtequestawellingtonwest-palm-beachwestlakeUnincorporated County

County forms include the Expedited Solar PV Permit Application and PV Rooftop Installation form. Ask the unincorporated Building Division whether the proposed system qualifies for the expedited path; use the selected checklist, equipment details, electrical and mounting plans and product approvals required for the project. Structural suitability, local zoning and inspections are separate from utility interconnection. A municipal site uses its city permit path. Contact the electric utility for its interconnection approval before energizing.

Check what applies to your address

Get a free answer for your location and project, rather than relying only on this general guide.

See the $19 Project Kit

Need everything organized? For eligible projects, the optional $19 Project Kit brings your filing steps, official documents, fees and progress checklist together. Government fees are separate.

Steps

  1. 1

    Confirm the exact site and local authority

    Resolve the address and PCN, then use municipal rules within city limits and County rules only for unincorporated property.

    discover.pbc.gov/pzb/building/Pages/Permit-Center.aspx
  2. 2

    Check project requirements before filing

    County forms include the Expedited Solar PV Permit Application and PV Rooftop Installation form. Ask the unincorporated Building Division whether the proposed system qualifies for the expedited path; use the selected checklist, equipment details, electrical and mounting plans and product approvals required for the project. Structural suitability, local zoning and inspections are separate from utility interconnection. A municipal site uses its city permit path. Contact the electric utility for its interconnection approval before energizing.

    discover.pbc.gov/pzb/building/Forms/Expedited_Solar_Checklis
  3. 3

    Prepare the current official application and supporting documents

    Use the selected official checklist and project specific forms. Confirm plans, survey, ownership authorization, contractor or license details and required overlay approvals with the responsible office.

    discover.pbc.gov/pzb/building/Forms/PV_Rooftop_Installation_
  4. 4

    File, obtain approvals and complete inspections

    Submit to the responsible authority, pay its assessed fees, respond to review comments and complete the required inspections. Do not begin work or operation before the applicable permit, occupancy or license approvals.

    discover.pbc.gov/pzb/building/Forms/Expedited_Solar_Checklis

Requirements

  • Exact premises address and parcel control number
  • Project scope and responsible local authority
  • Current official checklist and applicable overlay approvals

Documents

  • Applicant and owner authorization information
  • Plans and supporting materials required by the selected official application

Fees

ItemAmountNotes
Government review, permit or license feesProject specific; obtain current authority calculationCounty building schedule applies only to County permits. Municipal and state fees are separate.

Good to know

Use exact local jurisdiction. County forms are scoped to unincorporated property; confirm the city forms at its published destination.