Skip to main content

Septic System (OSTDS) Permit in Pinellas County

countywide

Florida transferred the septic (onsite sewage treatment and disposal system) program from the Department of Health to DEP under the 2020 Clean Waterways Act, but in Pinellas County the Florida Department of Health in Pinellas County (DOH-Pinellas) still handles septic permitting and inspections under DEP rules. DEP has directly taken over permitting only in 16 Panhandle counties and Marion County; Pinellas is not among them.

Check what applies to your address

Get a free answer for your location and project, rather than relying only on this general guide.

See the $19 Project Kit

Need everything organized? For eligible projects, the optional $19 Project Kit brings your filing steps, official documents, fees and progress checklist together. Government fees are separate.

Who needs this

Property owners installing, repairing, or modifying a septic system where sewer is unavailable, typically via a licensed septic contractor.

Steps

  1. 1

    Confirm septic is allowed and needed

    If central sewer is available, connection is generally required. Check with your sewer utility and DOH-Pinellas first.

    pinellas.floridahealth.gov/programs-and-services/environment
  2. 2

    Apply through DOH-Pinellas

    New construction and repair permits are administered by DOH-Pinellas Environmental Public Health ([email protected], 727-538-7277) using the state OSTDS application forms published on DEP's onsite sewage page. Site evaluation (soils, water table, setbacks) is part of the application.

    floridadep.gov/water/onsite-sewage
  3. 3

    Install with a licensed contractor and pass inspections

    A registered septic contractor or plumber installs the system; the permitting office inspects before cover.

    floridadep.gov/water/onsite-sewage

Requirements

  • Site evaluation
  • State OSTDS application forms
  • Licensed installer

Documents

  • Site plan
  • Soil/percolation evaluation
  • Floor plan/bedroom count for sizing

Fees

ItemAmountNotes
OSTDS permit feesNew system typical state components: $100 application/plan review + $115 site evaluation + $55 permit + $5 research surcharge + $75 initial inspection (Rule 62-6.030 F.A.C.)Rule 62-6.030(1) F.A.C., program moved from DOH 64E-6 to FDEP 62-6, amended 6-8-2026 (accessed 2026-09-01)

Good to know

Parts of Pinellas are in active septic-to-sewer conversion areas (see the knowledge article); a conversion project may change your obligations.