Driveway, drainage and right of way work in Palm Beach County

atlantisbelle-gladeboca-ratonboynton-beachbriny-breezescloud-lakedelray-beachglen-ridgegolfgreenacresgulf-streamhaverhillhighland-beachhypoluxojuno-beachjupiterjupiter-inlet-colonylake-clarke-shoreslake-parklake-worth-beachlantanaloxahatchee-grovesmanalapanmangonia-parknorth-palm-beachocean-ridgepahokeepalm-beachpalm-beach-gardenspalm-beach-shorespalm-springsriviera-beachroyal-palm-beachsouth-baysouth-palm-beachtequestawellingtonwest-palm-beachwestlakeUnincorporated County

Determine the road owner and exact work limits before filing. County Engineering, the municipality and FDOT control different road segments, and private streets may require owner consent. Ask the road authority which driveway connection, drainage, excavation, utility or maintenance of traffic approvals apply. A building permit is not permission to work in the road right of way. Use County Engineering for its roads and refer city roads to the municipality; do not report an absence of road closures from a contact handoff.

Steps

  1. 1

    Confirm the exact site and local authority

    Resolve the address and PCN, then use municipal rules within city limits and County rules only for unincorporated property.

    discover.pbc.gov/pzb/building/Pages/Permit-Center.aspx
  2. 2

    Check project requirements before filing

    Determine the road owner and exact work limits before filing. County Engineering, the municipality and FDOT control different road segments, and private streets may require owner consent. Ask the road authority which driveway connection, drainage, excavation, utility or maintenance of traffic approvals apply. A building permit is not permission to work in the road right of way. Use County Engineering for its roads and refer city roads to the municipality; do not report an absence of road closures from a contact handoff.

    discover.pbc.gov/engineering/Pages/default.aspx
  3. 3

    Prepare the current official application and supporting documents

    Use the selected official checklist and project specific forms. Confirm plans, survey, ownership authorization, contractor or license details and required overlay approvals with the responsible office.

    fdot.gov/
  4. 4

    File, obtain approvals and complete inspections

    Submit to the responsible authority, pay its assessed fees, respond to review comments and complete the required inspections. Do not begin work or operation before the applicable permit, occupancy or license approvals.

    discover.pbc.gov/engineering/Pages/default.aspx

Requirements

  • Exact premises address and parcel control number
  • Project scope and responsible local authority
  • Current official checklist and applicable overlay approvals

Documents

  • Applicant and owner authorization information
  • Plans and supporting materials required by the selected official application

Fees

ItemAmountNotes
Government review, permit or license feesProject specific; obtain current authority calculationCounty building schedule applies only to County permits. Municipal and state fees are separate.

Good to know

Use exact local jurisdiction. County forms are scoped to unincorporated property; confirm the city forms at its published destination.