Driveway and Right-of-Way Permit Routing — Hillsborough County

Unincorporated Countytampaplant-citytemple-terrace

Route driveway connections, sidewalk work, utility construction, drainage work, lane or road impacts, and other activity in a public right-of-way to the authority that owns or controls the road. Unincorporated County, Tampa, Plant City, and Temple Terrace use separate permit paths. A right-of-way permit does not replace building, site, zoning, utility, stormwater, tree, environmental, or temporary-traffic-control approval required by the actual project.

Check what applies to your address

Get a free answer for your location and project, rather than relying only on this general guide.

See the $19 Project Kit

Need everything organized? For eligible projects, the optional $19 Project Kit brings your filing steps, official documents, fees and progress checklist together. Government fees are separate.

Who needs this

Owners, developers, contractors, utilities, public agencies, and authorized applicants proposing a new or modified driveway/access connection or construction, installation, repair, maintenance, occupancy, or traffic interruption within a public road, sidewalk, shoulder, drainage area, or other right-of-way in Hillsborough County.

Steps

  1. 1

    Resolve parcel jurisdiction and road ownership separately

    Confirm whether the site is in unincorporated Hillsborough, Tampa, Plant City, or Temple Terrace, then identify the owner or controlling authority for the affected road and right-of-way. A mailing city, parcel jurisdiction, utility provider, maintenance request channel, or nearby boundary does not by itself prove road ownership. Route state, county, city, private, and other controlled roads to their actual authority.

    maps.hillsboroughcounty.org/MapHillsborough/MapHillsborough.
  2. 2

    Classify the proposed access and right-of-way work

    Identify new or modified residential or commercial driveway access, sidewalk or curb work, utility installation or maintenance, drainage or culvert work, landscaping or tree impact, excavation, material placement, lane or road closure, or other right-of-way use. Separate permanent access approval, construction authorization, utility approval, and temporary traffic control rather than treating them as one permit.

    hcfl.gov/businesses/permits-and-records/permits/apply-for-a-
  3. 3

    Use the County path only for eligible unincorporated County right-of-way

    For County-controlled right-of-way in unincorporated Hillsborough, use the current County Driveway Access permit application for residential or commercial site access and driveway connections, or the ROW Use Permit Other Uses for other work. The County expressly says it does not issue these permits for projects within Tampa, Plant City, or Temple Terrace.

    hcfl.gov/businesses/permits-and-records/permits/apply-for-a-
  4. 4

    Add County temporary traffic control when traffic will be interrupted

    If County right-of-way work will close or interrupt a lane or road, follow the separate Temporary Traffic Control permit route identified by the County. Confirm the current maintenance-of-traffic plan, schedule, notifications, inspection, and restoration requirements from the live case.

    hcfl.gov/businesses/permits-and-records/permits/apply-for-a-
  5. 5

    Use Tampa Transportation for City right-of-way

    For City of Tampa right-of-way, apply through the City's Right of Way Permitting section and Accela. Tampa states that sidewalk and driveway construction or repair within City right-of-way and utility construction or maintenance are regulated by this permit process. Use the current standard application process and fee schedule for the actual work.

    tampa.gov/tss-transportation/programs-and-services/right-way
  6. 6

    Use Plant City Engineering and its MaintStar portal

    For City of Plant City right-of-way or access work, route the project to City Engineering, which reviews engineering permits, site plans, traffic infrastructure, streets, and stormwater. Use the current MaintStar Engineering application family and confirm the project type, supporting plans, fees, inspections, and whether another road owner must approve the connection.

    plantcitygov.com/departments/development/engineering/index.p
  7. 7

    Obtain the Temple Terrace Engineering application packet

    For City of Temple Terrace right-of-way or easement work, contact the Office of the City Engineer for the current application packet. The City states that its Engineering Division administers and approves City right-of-way/easement permits and also manages street, storm-drainage, sidewalk, water, and sanitary-sewer projects.

    templeterrace.gov/130/Engineering
  8. 8

    Coordinate companion site, building, utility, drainage, and environmental approvals

    Confirm site/subdivision, building, zoning, transportation, utility-provider, stormwater or drainage, floodplain, tree, wetland, easement, accessibility, and other approvals triggered by the project. Do not assume that a driveway or right-of-way permit approves private-property construction, utility service, drainage discharge, tree work, or later development.

    hcfl.gov/businesses/land-development/site-and-subdivision
  9. 9

    Submit, protect traffic, obtain inspections, and restore the right-of-way

    Submit to the verified authority, pay calculated fees, respond to comments, obtain issuance before regulated work, and follow approved traffic-control, utility-locate, inspection, bonding, restoration, and closeout conditions. Approval from one authority does not authorize work in another owner's facility or right-of-way.

    tampa.gov/tss-transportation/programs-and-services/right-way

Requirements

  • Identify both parcel jurisdiction and the owner or controlling authority of the affected road/right-of-way.
  • Select the application matching driveway access, other right-of-way use, utilities, or temporary traffic control.
  • Provide current plans and supporting documents required by the responsible authority.
  • Obtain separate site, building, zoning, utility, drainage, tree, floodplain, environmental, and traffic approvals when triggered.
  • Protect traffic and existing facilities and complete required inspection, restoration, and closeout.

Documents

  • Property address, parcel or folio, jurisdiction, road name, and verified road/right-of-way owner
  • Site, access, driveway, utility, drainage, grading, sidewalk, curb, and restoration plans as applicable
  • Survey, right-of-way and easement information, existing-utility information, and utility-locate records
  • Maintenance-of-traffic or temporary-traffic-control plans and schedule when traffic is affected
  • Contractor, owner, utility, insurance, bond, authorization, inspection, and closeout documents required by the issuing authority
  • Companion building, site, zoning, tree, floodplain, environmental, and utility approvals when applicable

Fees

Good to know

Parcel jurisdiction and road/right-of-way ownership are separate determinations; this workflow does not infer the issuing authority from a mailing address or road name.The County permit page expressly excludes projects inside Tampa, Plant City, and Temple Terrace.Driveway/access approval, other right-of-way use, utility permission, drainage approval, temporary traffic control, building/site approval, and private-property construction remain distinct.Tampa's 12-to-15-business-day statement and the County's $50 base application fee are date-stamped to official pages reviewed September 24, 2026 and are not copied to other authorities.No road ownership, access approval, permit exemption, fee, processing time, utility clearance, drainage acceptance, inspection result, or restoration release is presumed.