The City of Pinellas Park runs its own building department. The Building Development Division of the Community Development Department performs permit plan reviews and inspections for construction inside city limits. Applications are submitted online through the city's Tyler Portico Plans, Permits and BTR Application Portal or in person at the permit counter at 6051 78th Avenue N; permit records, inspections, and contractor logins run through the Tyler EnerGov Civic Access portal. Note that the city website moved from pinellas-park.com to pinellaspark.gov.
Property owners and licensed contractors doing construction, additions, remodels, fences, roofs, pools, or trade work on residential property in the City of Pinellas Park. Permits are issued to licensed contractors, certified agents of a contractor with a signed and notarized Letter of Authorization, or owners of owner-occupied single-family residences (owner-builders complete an Owner / Occupant Affidavit).
Contractors: put insurance on file with the city first
Before applying, all contractors and companies must submit a Certificate of Insurance for General Liability and Workers Compensation (or a Workers Comp Exemption Certificate) to [email protected], with the certificate holder listed as City of Pinellas Park Building Development, 6051 78th Ave, Pinellas Park, FL 33781-1100. Contractors must hold a current state certified contractor's license and be licensed by the Pinellas County Construction Licensing Board.
pinellaspark.gov/1981/Applying-for-a-PermitPrepare plans and documents
Residential building permits require signed and sealed architectural plans including details, product approval, and energy calculations. A complete permit set typically requires a minimum of three complete sets of building plans and five sets of site plans, including plot plans, foundation, floor, and roof-framing plans, cross sections, elevations, and energy and structural calculations. The application asks for a description of work, owner name, address and phone, project address, square footage, and job valuation.
pinellaspark.gov/1982/Permit-RequirementsApply online or in person
Submit the application through the Tyler Portico Plans, Permits and BTR Application Portal, or in person at the permit counter, 6051 78th Avenue N, Monday to Friday 8:00 a.m. to 4:30 p.m.
pinellasparkfl.tylerportico.com/navigator/public/selections/Plan review
Most permit applications can be reviewed and a permit issued within 10 business days once all required documents have been submitted.
pinellaspark.gov/1985/Building-FAQsPick up the permit and schedule inspections
ID is verified at permit issuance. Track records and schedule inspections through the Tyler EnerGov Civic Access portal or contact [email protected]. Permits expire after 180 days without inspections.
egcss.pinellas-park.com/EnerGov_Prod/SelfService| Item | Amount | Notes |
|---|---|---|
| Building permit, one- and two-family dwellings, valuation $1,000 and less | $100.00 minimum | Administrative Fee Schedule, Resolution No. 2026-08 |
| Building permit, one- and two-family dwellings, valuation $1,000.01 to $50,000 | $100.00 for the first $1,000 plus $5.75 per additional $1,000 | $50,000.01 to $100,000 is $356.75 plus $4.75 per $1,000; over $100,000 is $644.25 plus $3.75 per $1,000 |
| Plan review fee, one- and two-family | $100.00 or one-half of total permit fees, whichever is greater | Resubmittal $50 or one-half; technology and enhancement fee $5 to $25 tiered on permit cost |
Fee amounts change, the linked official schedule always controls.
Building Development Division: 727-369-5647, [email protected], 6051 78th Avenue N, Pinellas Park, FL 33781, Monday to Friday 8:00 a.m. to 4:30 p.m. The former domain pinellas-park.com redirects to pinellaspark.gov; the EnerGov portal still uses the egcss.pinellas-park.com subdomain.